Project Overview

Mission-critical facilities cannot lose power. Steel City Electric replaced the electrical service at a secure GEO Group facility in Tampa, building a new equipment pad, setting new Eaton switchgear and service-entrance equipment, coordinating the utility transformer, and installing a Generac industrial standby generator with an automatic transfer switch so the facility stays powered through outages. All work was performed under the facility's security protocols: background-checked electricians, controlled access, escorted work areas and documented shutdowns.

Scope of Work

Site excavation and new reinforced concrete equipment pad • New service-entrance switchgear (Eaton) and distribution sections • Utility transformer and metering coordination • Generac industrial standby generator with automatic transfer switch • Scheduled, documented shutdowns to keep the facility operating • Security-cleared crew with escorted access

Project Result

The facility now has a modern, code-compliant electrical service with standby power that starts automatically on utility loss. The work was completed with planned shutdown windows and no disruption to facility operations.

Planning an Electrical Project?

Steel City Electric works with contractors, businesses, property managers to deliver safe and reliable electrical installations.

Contact Steel City Electric today to discuss your project.
Scroll to Top
CONTACT US