Project Portfolio

Licensed & Insured (EC13014807) • Commercial, Industrial & Mission-Critical Electrical • $3M Bonding Capacity

Ground-up construction, tenant build-outs, service and switchgear upgrades, standby power and emergency restoration — delivered for general contractors, owners and facility managers.

Sarasota, Manatee, Hillsborough, Pinellas, Charlotte, DeSoto and Lee Counties

1,600 A

480/277V three-phase service installed for IKEA Sarasota

13+ Years

Commercial and industrial electrical experience with zero lost-time incidents

$3M

Aggregate bonding capacity for plan-and-spec and design-build work

24/7

Emergency response, temporary power and storm restoration

Selected Projects

A sample of recent work. Every project below was permitted, inspected and delivered by Steel City Electric crews — not subcontractors.

Eaton switchgear and service entrance at GEO Group secure facility, Tampa FL – Steel City Electric

GEO Group – Tampa Secure Facility

Government / Mission-Critical Facility

Secure Detention Facility • New Service Entrance & Eaton Switchgear • Generac Industrial Standby Generator • Owner-Direct
View Project →
Completed Bealls Florida #63 store build-out in Bradenton

Bealls #63 – Bradenton Creekwood

Retail Tenant Build-Out

Retail Store Build-Out • Lighting & Lighting Controls • Branch Power & IDF • General Contractor: Hollandsworth Construction
View Project →
IKEA Sarasota store exterior during construction – full electrical build-out by Steel City Electric

IKEA Sarasota

Commercial New Construction / Big-Box Retail

1,600 A 480/277V Three-Phase Service • 80,000 ft of Wire • 1,000 Light Fixtures • 8-Person Crew, 16 Weeks • General Contractor: R.E. Crawford Construction
View Project →
LA Fitness Miami Gardens

LA Fitness – Miami Gardens

Fitness Club Renovation

Club Renovation • Lighting & Receptacles • Low-Voltage & TV Installation • General Contractor: Vision General Contracting
View Project →
LA Fitness Tampa FL

LA Fitness – Tampa (Bruce B. Downs)

Fitness Club Renovation

Weight-Room Build-Out • Lighting & Dedicated Circuits • TV & Low-Voltage • General Contractor: Vision General Contracting
View Project →
Stoneybrooke Clubside Condominiums

Stoneybrook Clubside Condominiums – Sarasota

Emergency Power Restoration

Two 30-Unit Buildings • 120 kW Temporary Generators • 32 Failed Conductors Replaced • Megger Testing • Owner-Direct
View Project →
Photo Apr 11 2026 2 32 16 PM

Foot Locker – International Plaza, Tampa

Retail Display Electrical Installation

International Plaza • Overnight Installation • LED Display Power & Signage • General Contractor: Vision General Contracting
View Project →
ptsol

PT Solutions Physical Therapy – Apollo Beach

Medical Facility Electrical Build-Out

400 A, 480Y/277V Three-Phase Service • Medical Clinic Tenant Build-Out • Full Electrical Scope • Owner-Direct
View Project →
footlocker

Foot Locker – UTC Mall, Sarasota

Retail Display Electrical Installation

UTC Mall • Overnight Installation • LED Display Power & Signage • General Contractor: Vision General Contracting
View Project →
Insomnia Cookies storefront in Sarasota, FL — commercial electrical by Steel City Electric

Insomnia Cookies – Sarasota

Retail Electrical Tenant Build-Out

400 A Service Upgrade • Commercial Kitchen Power • Retail Tenant Improvement • General Contractor: Cox & Company
View Project →
1

Stoneybrook Terraces II – Sarasota

Emergency Power Restoration

30-Unit Building • 120 kW Temporary Generator • 8 Failed Conductors Replaced • Owner-Direct
View Project →
suntide

Suntide Island Beach Club – Sarasota

Fire Alarm System Restoration

62-Unit Beach Club • Fire Alarm Control Panel Replacement • Hurricane Damage Restoration • General Contractor: Panhandle Restoration & Cleaning
View Project →

Planning a project?

Send us the plans and a licensed estimator will follow up with a firm price.

Scroll to Top
CONTACT US